St George Wharf Tower

Date: 2012/2013
Address: Vauxhall, London
Client: Brookfield Multiplex / Broadway Maylan / St George South London Limited

Integral Cradles Ltd secured this prestigious order in December 2012 to provide a bespoke access system on the Broadway Maylan Architects’ designed St George Wharf Tower.

The project is the tallest solely residential tower in the UK and is yet another high profile scheme that Integral has secured for contractor Brookfield Multiplex following on from the recent successful completion of the project Strata Tower.

This solely residential development made up of 52 storeys is 185m tall and houses 212 luxury apartments. It is the tallest of its kind in the UK. Integral provided one telescopic building maintenance unit with the capacity to lift glass up to 550 kg.

The BMU equipment has been installed upon a unique freely-laid system that encompasses noise-reducing elements, required to satisfy reduced noise levels due to the installation being in close proximity to the Penthouse.

The BMU was designed to fit in the roof-top parking garage enabling the equipment to be protected from the elements when not in use.

01/02/2016 -  The Building Maintenance Unit for 48 Leicester Square is due to be lifted on the building throughout... Read more