Integral Cradles, a leading provider of specialist access solutions, has been appointed by the Berkeley Group to provide façade access equipment for Building H1 at King’s Road Park, the major regeneration scheme in Fulham being delivered by St William Homes.
King’s Road Park is a 17.35-acre development comprising 24 building plots. The scheme will provide 1,800 private and affordable homes set within 2.7 hectares of new public realm, including a public park that houses the oldest gas holder in the world. The development will also improve connectivity between the King’s Road and Imperial Wharf across a previously industrial site.
For Building H1, Integral Cradles will supply:
- A BMU with 19.5m reach and an auxiliary winch with a capacity of 500kg, running on a curved twin track system
- A 32-tonne capacity lift table, allowing the BMU to be parked at a lower level
Design work is already well underway, and the project will see the team deliver a tailored solution for one of west London’s most significant residential regeneration schemes.
Discussing the appointment, Kevin Walton, Managing Director at Integral Cradles, said: “We are delighted to have been appointed to provide the façade access solution for Building H1 at King’s Road Park. This is a landmark regeneration scheme for Fulham, and we look forward to working closely with the Berkeley Group and St William Homes to deliver a system that meets the building’s specific access requirements.”

