
Address: 8 Canada Square, Canary Wharf
Client: Mace / Overbury / HSBC
HSBC Tower, Canary Wharf, London
The BMU’s on the iconic HSBC Tower, 8 Canada Square are to be removed and replaced by Integral Cradles Ltd.
Working with MACE, Overbury and HSBC, we will remove the existing redundant equipment and replace with two newly manufactured units – all to be installed and commissioned without the use of a tower crane but assembled through the building without any disruption to the day to day workings of this live building. Design and logistics works are currently underway with an installation starting in early January 2015.